Case Study: Arc Furnace Capacity Upgrade
Project background: The client, who is a steel melting and manufacturing company in Illinois, USA, wanted to increase production output capacity by increasing the number of heats per shift from five (5) heats to seven (7) heats per shift. Each production shift is limited to 10 hours. Electrical system: The client’s existing electrical substation include […]